It wasn’t supposed to rain on Tuesday, which is why I decided to schedule the rooftop A/C repair for that afternoon.
My commercial client wanted the labor done on Tuesday, however the forecast was for rain. It poured down rain really difficult on Tuesday, so I was thrilled that I did not drive all the way out to the commercial labor site. Tuesday afternoon when I woke up, I looked at the forecast. The weatherman said it was going to be partly cloudy with zero opportunity of rain. It looks like there was more of a opportunity of rain to me than that, however I’m not a weather guy. I contacted the commercial client to let his know that I was on the way to his business. It took about 45 minutes to get to the address which is just on the outside of town. The man owns a dry cleaning supplier as well as there was no A/C at all. The system is located on the roof. The roof is seasoned as well as there is metal up there. It’s the last place you want to be in a rainstorm where thunder as well as lightning are expected. I had all of my supplies on the roof when the thunder started. The sound of thunder made me get down as well as off of the roof. I wanted to help the commercial repair client with the A/C problem, even though I did not want to get struck by lightning. I told his that my buddy and I would have to wait again until the weather was clear.